ARREGOTA NOVA SUBSTATION
Details
Description: Execution of the High Voltage and Medium Voltage infrastructure associated with the Arregota Nova Substation, including the construction of a High Voltage Overhead Line approximately 20 km long and four Medium Voltage lines with a total length of approximately 13 km.
Location: Grândola, Portugal
Cliente: E-REDES
Conclusion: 2026